Wyndham City invites tender submissions from suitably qualified and experienced contractors to procure, supply, install and commission new battery energy storage systems (BESS) and required monitoring systems across two existing Community Centres.
Integrate and configure batteries with existing rooftop solar PV systems at each site and provide all relevant network and connection approvals. Increase solar self-consumption, reduce peak demand and network charges. Allow tariff optimisation and provide standby supply to nominated critical circuits during a loss of the mains supply.
The tender package is available for download via Tender Link. Note that registration on the portal is required. There is no cost to register.
All Request for Information (RFI’s) relating to these works and services should be directed through the Message Forum established for this tender.
Tender submissions must be lodged electronically via the Tender Link portal no later than 12.00 Noon (AEDT) Wednesday 14th October 2026.
Late or emailed tender submissions will not be accepted. The lowest or any tender will not necessarily be accepted.
Procurement Unit
Wyndham City Council