Facing the block, record all footpath bays from LEFT to RIGHT identifying property boundaries, location of vehicle crossing/s, parking bays, stormwater pits, nature strip trees and whether a stormwater drain is under the path. Mark locations of any existing damage, including to the kerb and channel.
Refer to the example below:
Blank example template for builder to download if a template is required