Suburb:
  • Tarneit
Phase:
Planning
Budget:
  • $41.5 million
Dohertys Road Duplication (Tarneit Road to Sapling Boulevard)

The Dohertys Road duplication (Tarneit Road to Sapling Boulevard) is a key project in Wyndham City’s Connecting Wyndham: Major Projects program and will significantly improve safety for all road users while ensuring the road network can support future population growth. 

Features 

  • Duplicating Dohertys Road to two lanes in each direction between Tarneit Road and Sapling Boulevard  
  • Upgrading the roundabout at Dohertys Road and Tarneit Road to a traffic light intersection
  • Installing traffic lights at the Dohertys Road and Rosso Drive intersection  
  • Realigning Dohertys Road to avoid multiple crossings of Dry Creek, as well as a new bridge over Dry Creek with new pathways to improve safety and accessibility for pedestrians and cyclists 

This project is currently in the planning and design stage – stay tuned for further updates.    

Benefits 

  • Improved road safety: the duplication of Dohertys Road and the upgraded intersections will significantly enhance safety for all road users and ensure the road network can support future population growth.
  • Reduced travel times: additional lanes and traffic signal upgrades will result in shorter travel times and less congestion, getting you home sooner and safer.  
  • Enhanced pedestrian and cycling accessibility: upgraded pathways will provide safer, more convenient routes for pedestrians and cyclists. 
  • Reduced creek crossings: the realignment of Dohertys Road will remove two of the road crossings over Dry Creek and deliver an upgraded bridge crossing that will provide a flood-free road for up to a 1 in 100-year storm event, reducing the number of road closures due to flooding.

This important project is a key part of Wyndham City’s Connecting Wyndham program, which is creating a safer, more efficient, and connected transport network for residents and visitors alike.    

Please refer to our Capital Works Dashboard for the latest updates on this project: https://www.wyndham.vic.gov.au/capitalworksdashboard  

Back to top